Transcript of Mission Order
- Line 1: TO: CAPT G HARRY STEIN
- Line 2: USS WHITE SANDS NAR-0002
- Line 3: (Space)
- Line 4: FROM: COMMODORE PETER BRYCE
- Line 5: STARFLEET ADVANCED TECHNOLOGIES DIVISION
- Line 6: (Space)
- Line 7: SUBJECT: RIGEL/ANDOR SUBSPACE RELAYS
- Line 8: (Space)
- Line 9: STARDATE: 410[...]
- Line 10: (Space)
- Line 11: [...] MONITORING OF COMMUNICATION TRAFFIC LOADS THROUGH THE
- Line 12: [...]
- Line 13: (Space)
- Line 14: [...] RECERTIFICATION OF THE SUBSPACE RELAY STATIONS
- Line 15: ALONG THE RIGEL/ANDOR LINK.
- Line 16: (Space)
- Line 17: ANY INDIVIDUAL STATIONS TO BE PERFORMING BELOW STFL SPEC 0473/111243 SHOULD BE TAKEN
- Line 18: OFF-LINE AND REPAIRED IN PLACE. YOU ARE INSTRUCTED TO REPEAT THIS PROCEDURE ON ALL RELAYS IN
- Line 19: THE LINK UNTIL THE SYSTEM IS WITHIN 7% OF RATED PERFORMANCE.
(End)